ReqSuite® Requirements Manager (RM)
Interfaces

Besides exporting and importing data via file-based standard data exchange formats, project contents can also be directly synchronized between ReqSuite® RM and downstream tools like JIRA, TFS, and GitLab.

 

Figure 1. Export via Interfaces

Figure 2. Export via Interfaces through Grid Menu

  • Synchronize with: Allows mapping of state values with ReqSuite-compliant tools. The content elements of the categories previously enabled via project administration of a project (see Project Management) can be synchronized with compatible tools by left-clicking on the desired interface.

Note: For more hands-on details on the synchronization features of ReqSuite, please take a look at the following tutorial video: